Hog Island Water Master Plan
Service Areas
Engineering
Project Description
Y2 teamed with Dahlgren Consulting to perform the Master Plan Level I Study, which included holding scoping and project meetings with the general public and the Improvement and Service District. Y2 performed a comprehensive literature review and performed population growth and water demand projections, an existing water system inventory, and evaluation. Following those steps, we performed development of new water system concepts. Throughout the span of this study, a GIS was developed to represent the current and proposed conditions for the ISD.
All aspects of this water system were examined including, hydraulic modelling, well siting, and review of existing water quality reports. As part of the inventory process, water quality samples were taken to assess water quality baselines. The final stages of this project were the development of water rights research, development of cost estimates, and financing options. This project was delivered on time to the Wyoming Water Development Commission.