Cheyenne, WY Y2 provided professional services to develop 35% design plans for the reconstruction of East Pershing Boulevard between U.S. 30 (East Lincolnway) and Christensen Road. There has been extensive residential and industrial development within the immediate project area. In addition, the recent extension of Christensen Road from US 30 to the Campstool Road Interchange has directly impacted the use of the East Pershing Boulevard corridor. This corridor study took a comprehensive review of the current and future traffic demands, as well as evaluated the needs of non-motorized users …
Survey
Lone Tree Creek Headcut Stabilization
Y2 worked with the Natrona County Conservation District, a local landowner, and the Wyoming Game and Fish Department for this stream stabilization and headcuts project. The headcuts are threatening wet meadows and contributing excessive sediment into the downstream North Platte River. Y2 identified a design approach to stabilize the headcuts, protect and reestablish wet meadows above the headcuts to slow further sediment contributions downstream. These improvements will promote stream channel stability, natural channel function, and floodplain connectivity to potentially reclaim the lost …