East Pershing Boulevard Corridor Study

Cheyenne, WY
Y2 provided professional services to develop 35% design plans for the reconstruction of East Pershing Boulevard between U.S. 30 (East Lincolnway) and Christensen Road. There has been extensive residential and industrial development within the immediate project area. In addition, the recent extension of Christensen Road from US 30 to the Campstool Road Interchange has directly impacted the use of the East Pershing Boulevard corridor. This corridor study took a comprehensive review of the current and future traffic demands, as well as evaluated the needs of non-motorized users along the corridor.