Service Areas Engineering Project Description Y2 was involved in the planning and site design from project conception. The civil engineering team designed the pedestrian entrance to the school, providing separate drop off areas for cars and buses while allowing for students to arrive at a central location. The team also designed the water treatment, storage, and distribution system, using an existing on-site well, providing the design for a new concrete water tank, and designing the treatment and distribution system with booster pumps and UV treatment. For …
Natural Resources
Bar BC Creek Restoration
Service Areas Engineering, Natural Resources Project Description The Bar BC Creek Restoration project provides an example of Y2’s ability to use engineering techniques while working within the framework set up by local, state, and federal agencies and alongside other consulting firms, including Alder Environmental. The project consisted of reestablishing a section of the Bar BC Creek to provide better water flow and wildlife habitat, specifically cutthroat trout spawning habitat, and replacing a culvert passing through the Hansen Levee and discharging into the Gros …